Battery Park City Authority – Completed Construction Projects
Permeable Pavers Pilot Project - Installation
Location: Rockefeller Park, North Lawn Pathway
Completed: Summer 2023
Pylons & Glass Benches – Artwork repairs
Location: Belvedere Waterfront & South of the Irish Hunger Memorial
Completed: Spring 2024
NYC Police Memorial – Expansion
Location: Riverwalk at Liberty Street & South End Avenue
Completed: July 2022
Community Center Restoration Project
Location: Bounded by Warren St. (north), Murray St. (south) & West St. / 9A (east)
Completed : September 2021
Ball Fields Resiliency Project
Location: Bounded by Warren St. (north), Murray St. (south) & West St. / 9A (east)
Completed: April 2022
Pile Remediation – Phase 7
Location: Multiple locations along BPC Esplanade: adjacent to Wagner Park;
adjacent to Rector Place; adjacent to Rockefeller Park
Completed: March 2022
Irish Hunger Memorial Restoration
Construction began in 2016 on the Irish Hunger Memorial Restoration and Waterproofing Project, which was designed to repair damage to the Memorial and arrest and remediate water infiltration into the Memorial structure.
Completed: Fall 2017
South Cove Jetty Decking Replacement & Bracing Repair
The South Cove (the “Cove”) is a nationally significant waterfront art installation located in the southern neighborhood of Battery Park City at the Waterfront Esplanade between First Place and Third Place that includes a curved, wooden jetty that extends into the water.
Completed: 2019
West Thames Pedestrian Bridge
The West Thames Pedestrian Bridge links the south neighborhood of Battery Park City to the east side of West Street, and provide residents of and visitors to Battery Park City, a safer means of crossing the West Side Highway.
Completed: 2019
North Esplanade Restoration Project
Construction began in 2016 on the North Esplanade Restoration Project to restore certain portions of the Esplanade platform, granite slabs, pile caps, timber piles and rip rap.
Completed: 2017